Earned Value Project Management
5 Minutes Podcast with Ricardo Vargas - Podcast készítő Ricardo Viana Vargas - Hétfők
Kategóriák:
In this podcast Ricardo Vargas talks about the main concepts involved in the earned value analysis. This podcast was recorded only in Brazilian Portuguese. The link below is for the Brazilian Portuguese version.
